Construction of a new £300 million teaching and research campus for the University of Glasgow is to get underway this month.
The Keystone building is due to be complete by the start of the 2028/29 academic year and will be located on the university’s historic Gilmorehill campus in the West End of Glasgow.
It is the fifth major building to be constructed through the University of Glasgow’s £1.3 billion Campus Development Programme; the most recent one being the Adam Smith Building School which opened in December 2023.
University chiefs say the new development will be a ‘world-class’ facility dedicated to learning, teaching, and research. Concept pictures of the new building have also been revealed today as part of the announcement.
It will span a total of 27,000 square metre, and accommodate around 3,600 students making it the second largest building on the University’s campus by size, after the Gilbert Scott Building.
Professor Sir Anton Muscatelli, Principal and Vice-Chancellor of the University of Glasgow said: “The Keystone building is the exciting next step in our Campus Development Programme, which is transforming our campus and the student experience at the University of Glasgow.
“This is a hugely significant investment for our community, providing state of the art learning and teaching facilities for over 3,600 students, which will allow us to continue to attract the brightest and best students and staff to Glasgow.
“In addition, it will deliver a range of specialist equipment and spaces to support our world-leading education in Engineering and Biomedical sciences.
"This investment in Keystone also signifies the University’s continued commitment to being a civic institution for Glasgow, creating vibrant new spaces which will be of benefit to not only our own students, but also to our local community.”
Designed by HOK architects and constructed by the University's principal contractor, Multiplex, the building will serve as a hub for students of all disciplines and offer a mix of general teaching spaces, technical facilities, collaborative areas, and a café.
Alongside general learning and teaching areas, the Keystone building will also house a range of dry and wet lab spaces, as well as high-spec computing labs. It will also provide a maker’s workshop and general teaching facilities for the University of Glasgow’s James Watt School of Engineering.
The Keystone will be the University’s most sustainable building, aiming to achieve ‘BREEAM Excellent’ certification, along with ambitious energy use targets.
Gary Clark, HOK's regional principal of Science +Technology, said: “The Keystone represents the future of interdisciplinary science and teaching with advanced research labs, teaching ‘super labs’ and the latest in sustainable design.
“Once open, it will be one of the largest net-zero-carbon university buildings in the UK, and one of the most welcoming, with neuro-inclusive workspaces embedded throughout.
“The building complements the historic architecture of the University of Glasgow through the use of stone, brick and terracotta while its dramatic responsive façade design, inspired by Victorian architecture, reveals the art of the possible in terms of both scientific learning and net-zero development.”
Why are you making commenting on The Herald only available to subscribers?
It should have been a safe space for informed debate, somewhere for readers to discuss issues around the biggest stories of the day, but all too often the below the line comments on most websites have become bogged down by off-topic discussions and abuse.
heraldscotland.com is tackling this problem by allowing only subscribers to comment.
We are doing this to improve the experience for our loyal readers and we believe it will reduce the ability of trolls and troublemakers, who occasionally find their way onto our site, to abuse our journalists and readers. We also hope it will help the comments section fulfil its promise as a part of Scotland's conversation with itself.
We are lucky at The Herald. We are read by an informed, educated readership who can add their knowledge and insights to our stories.
That is invaluable.
We are making the subscriber-only change to support our valued readers, who tell us they don't want the site cluttered up with irrelevant comments, untruths and abuse.
In the past, the journalist’s job was to collect and distribute information to the audience. Technology means that readers can shape a discussion. We look forward to hearing from you on heraldscotland.com
Comments & Moderation
Readers’ comments: You are personally liable for the content of any comments you upload to this website, so please act responsibly. We do not pre-moderate or monitor readers’ comments appearing on our websites, but we do post-moderate in response to complaints we receive or otherwise when a potential problem comes to our attention. You can make a complaint by using the ‘report this post’ link . We may then apply our discretion under the user terms to amend or delete comments.
Post moderation is undertaken full-time 9am-6pm on weekdays, and on a part-time basis outwith those hours.
Read the rules hereLast Updated:
Report this comment Cancel